§ 15-41. Cost of resurfacing to be borne by permittee  


Latest version.
  • If, after the refilling of an excavation, the permittee fails or refuses to resurface or repair that portion of the surface of the street damaged by him, or if the city engineer has elected to do such resurfacing or repairing, the city engineer shall do so and the permittee shall be charged with the cost thereof computed by the city engineer as provided in section 15-32 or section 15-34, whichever, in the judgment of the city engineer, will most fairly compensate the city for the expenses incurred by it.

(Code 1960, § 7217; Ord. No. 80-2, § 2, 2-4-80)